Our process · Calgary design-build studio

How a HAUS Interiors project unfolds

How a HAUS Interiors project unfolds

From a conversation in your home to the final reveal: seven stages, one studio, one point of contact.

A highly managed roadmap for luxury interior design and renovation in Calgary. Design, procurement, project management and installation run under a single point of accountability, so nothing is lost between the designer, the suppliers and the trades.

Begin with a consultation →

00

Consult

01

Planning

02

Development

03

Finalization

04

Procurement

05

Construction

06

Installation

✦

The reveal

00

Consult

01

Planning

02

Development

03

Finalization

04

Procurement

05

Construction

06

Installation

✦

The reveal

Onboarding

Design · about 10 to 12 weeks

Production · procurement to installation

Handover

Stage

00 / 06

00

00

00

Consult & onboarding

Consult & onboarding

Consult & onboarding

A solid foundation, on which every project is built.

Every project begins with a discovery call, then a two-hour creative working session in your home. We walk every space in scope, review your floor plans and inspiration, and talk through how you live. Within five business days you receive a written proposal. Signing your service agreement completes onboarding, and the creative work begins.

You receive

Written proposal

Your brief and objectives, a mood board and design direction, the three design phases and their schedule.

Fee proposal

A room-by-room design fee estimate with its payment schedule, plus estimated production costs.

Service agreement

Official onboarding: your agreement is signed and the creative work is scheduled to begin.

Typical timing

Two hours on site · proposal within 5 business days

The design consultation →

person in orange long sleeve shirt writing on white paper

Onboarding · the service agreement

Furnished main floor plan of the Strathcona Residence in Calgary by HAUS Interiors

Stage

01 / 06

01

01

01

Planning

Planning

Planning

Function and feeling come first.

Each project is built from the ground up around two of our three design pillars, function and feeling. We develop optimized floor plans, furniture layouts and mood boards to establish the look and feel, setting the foundation for a space grounded in intention.

You receive

Floor plans

Technical 2D scaled drawings for space planning.

Furniture layouts

Scaled layouts showing how every room in scope will be furnished and lived in.

Mood board

Inspirational images for the proposed design direction.

Typical timing

3 to 4 weeks

Colour and material board with oak, marble, leather and stone samples
Colour and material board with oak, marble, leather and stone samples

Floor plan · Strathcona Residence, Calgary

Stage

02 / 06

Development

Development

Development

Form, piece by piece.

In the second phase we explore the third design pillar, form, curating a distinct selection of products and materials to realize the chosen layout and design direction. Selections, materials and elevations are locked in, so the aesthetic and the architecture evolve together rather than in isolation.

You receive

Selections

Furniture, lighting, fixtures and decor, curated for each room in scope.

Materials

Hard surfaces, finishes and fabrics, chosen to carry one palette through every room.

Elevations

Technical 2D scaled drawings for custom millwork and every reconstructed element.

Typical timing

4 to 6 weeks

02

02

02

Hands selecting wood, stone and tile samples for an interior design scheme

Selections · materials and finishes

Stage

03 / 06

03

03

03

Finalization

Finalization

Finalization

See it before it is built.

In the third and final design phase, everything is rendered, drawn and costed. You see the finished home, and what it takes to deliver it, before anything is ordered.

You receive

Design renders of a kitchen and a living room with a dark fireplace wall
Design renders of a kitchen and a living room with a dark fireplace wall

i.

3D renders

We create the final visuals: photorealistic 3D renders depicting the final space, so every room can be seen and refined before anything is built.

Construction drawings: fireplace wall and built-in cabinetry elevations with dimensions
Construction drawings: fireplace wall and built-in cabinetry elevations with dimensions

ii.

Construction drawings

The issued-for-construction (IFC) drawing package: elevations and technical drawings, drawn to scale, giving every trade one accurate reference point to build from.

Kitchen selections board with lighting, ovens, faucets, sink, stool and tile, specified and costed
Kitchen selections board with lighting, ovens, faucets, sink, stool and tile, specified and costed

iii.

Production costs

A comprehensive production cost estimate: every product, trade and logistical cost needed to implement the project.

Design renders of a kitchen and a living room with a dark fireplace wall

3D renders · Strathcona Residence, Calgary

Construction drawings: fireplace wall and built-in cabinetry elevations with dimensions

Elevations, drawn to scale · Strathcona Residence

Kitchen selections board with lighting, ovens, faucets, sink, stool and tile, specified and costed

Kitchen selections, specified and costed · Strathcona Residence

Typical timing

2 to 3 weeks

Stage

04 / 06

04

04

04

Procurement

Procurement

Procurement

Every order placed, tracked and consolidated.

All product, material and trade-related orders are placed with the respective stakeholders. Every product is sourced through our trade-exclusive network, with flat-rate shipping and duties included.

Your project manager handles vendor purchase orders, payments and deliveries, with tracking and consolidation along the way, while subcontractor agreements, deposits and permits are put in place for the site.

We handle

Vendors

Purchase orders, payments, order tracking and consolidation.

Trades

Subcontractor agreements, deposits and permitting.

Scheduling

Delivery scheduling, managed by your project manager.

Typical timing

4 to 12 weeks

Stage

05 / 06

05

05

05

Construction

Construction

Construction

Where things get a little messy.

Typical timing

Set by the scope of work

All site work takes place here, starting with site preparation, demolition and material delivery. On-site project management is led by a certified project manager, and every trade is appointed and managed under HAUS Interiors subcontractor agreements, with regular site visits, quality tracking and one point of contact.

We manage

Site preparation

Protection of everything that stays, then demolition of what does not.

Materials

Delivery of the materials and trims each trade needs.

Project management

Each trade scheduled and supervised, with deficiencies addressed as each scope is completed.

Changes are handled through individual change orders, agreed with you before any new work begins.

Zen Luxury Staging living room with low layered seating and floor-to-ceiling windows, staged by HAUS Interiors, Calgary

Zen Luxury Staging · Heartwood, Calgary · 2025

Stage

06 / 06

06

06

06

Installation

Installation

Installation

The final layer, then the reveal.

Once construction and cleaning are complete, we install all your furniture and decor. Wallpaper and window treatments go up, debris is removed and the home is professionally cleaned, ready for the final reveal and handover.

You receive

Furniture

Delivered through white-glove service, coordinated on site by your project manager.

Decor & styling

All decor and accessories installed, with final styling by your designer.

Reveal & handover

We reveal, walk through, and invite you to enjoy your newly transformed space.

Typical timing

1 to 2 weeks

The reveal

Strathcona Residence in Calgary before its renovation, with a plum feature wall and wood floors

Before

Renovated dining room and open living area at the Strathcona Residence in Calgary

After

Strathcona Residence · Calgary · Full-home renovation

Six phases, one studio, from the first floor plan to the final reveal.

Read the case study →

Investment

How your investment flows

Two clear parts, invoiced at set milestones. Never hourly billing.

In luxury design, time should be spent on creativity and precision, not on tracking minutes. Our fees come in two clear parts, a fixed design fee and a production fee, so you know your investment before work begins.

Stage

When it is invoiced

Share

00

Consultation

Your two-hour in-home design consultation. Credited in full toward your design fee when you sign your service agreement within 30 days of receiving your proposal.

$500 + GST

Design fee

A fixed fee, based on the square footage being transformed

01

Planning

Initiated when you accept your fee proposal.

50%

02

Development

Initiated after your review and feedback on Planning.

30%

03

Finalization

Initiated after your review and feedback on Development.

20%

Production fee

A sliding-scale management fee, from 20% down to 10% as the project grows

04

Procurement

Implementation deposit, to initiate procurement, secure trade partners and finalize the production schedule.

50%

05

Construction

Progress investment, billed at the midpoint of on-site renovation and custom fabrication.

30%

06

Installation

Settled just before the white-glove furniture installation.

15%

✦

Reveal

The remaining balance, settled after the final handover and reveal.

5%

The production fee covers procurement, trade coordination, site visits and your concierge reveal. Changes are handled through individual change orders, agreed before any new work begins. Your proposal sets out your own fees and payment schedule.

Full-service design & build →

Along the way

You always know where things stand

One studio, one point of contact, from the first conversation to the final reveal.

i.

One point of contact

You work directly with principal designer Michael Anderson, supported by a dedicated project manager who is your single point of contact through every stage.

ii.

Review at every phase

Each design phase begins after your review and feedback on the last, so nothing moves forward without you, and changes are agreed through change orders.

iii.

Tracking and site visits

Vendor orders are tracked and consolidated, deliveries scheduled, and the site visited regularly with quality tracking until handover.

Our fixed design fee covers every call, message and meeting, so you never need to watch the clock.

Questions

Process questions

Clarity, architectural rigour and the white-glove journey.

Neo Classical show home dining nook with a curved banquette, round table and oval mirrors

Neo Classical Show Home · Heartland, Cochrane

How does your workflow ensure a seamless, white-glove experience?

HAUS Interiors guides every project through an exacting six-phase workflow, from initial planning to final installation. A structured design roadmap replaces the anxiety of an open-ended renovation with beautifully orchestrated, predictable milestones.

What are the fundamental stages of your architectural framework?

After onboarding, the realization of a home is divided into six distinct, intentional phases: Planning, Development, Finalization, Procurement, Construction and Installation. The framework addresses every detail of the lifecycle.

What occurs during the initial conceptualization phase?

True alignment begins before any drawings are drafted. Onboarding includes a discovery call and a two-hour design consultation in your home: a deep dive into your lifestyle, investment scope and aesthetic goals, so the roadmap is calibrated to how you intend to live in the space.

How is structural integrity managed before demolition begins?

Precision is paramount when altering a home's footprint. Our process for structural renovations requires all IFC (Issued for Construction) drawings and engineering reviews to be locked in before a single wall is removed.

What defines the final installation and reveal of my home?

The conclusion of a HAUS Interiors commission is a calculated debut. During installation, bespoke furnishings are placed, textiles are steamed and the home is professionally cleaned, resulting in a turnkey handover that requires no effort on your part.

How do construction drawings and 3D renders protect my investment?

Before a single wall is touched, we finalize elevations, material selections and issued-for-construction drawings, giving you full visual certainty and giving our trades one accurate reference point to build from.

What happens during the Design Development phase?

This is where the vision becomes tangible. Material selections, elevations and detailed specifications are locked in, so the aesthetic and the architecture evolve together rather than in isolation.

How involved will I need to be once construction begins?

Our process is designed so your role shifts from decision-maker to observer once procurement and construction begin. With project management led by your dedicated project manager, we manage the trades, timelines and quality control on your behalf.

Begin your journey

Your route starts with one conversation.

Reserve your design consultation, or begin with a discovery call. We will point you to the right first step.

Tools

EstimatorComing soonStyle guideComing soonPartners

Contact

Calgary, Alberta+1 587.439.1722concierge@hausinteriordesign.caMonday to Friday, 9 to 5 p.m.
© 2026 HAUS Interiors – Luxury Design & Build Studio Inc.Crafted for the Senses. Designed for Living.

Tools

EstimatorComing soonStyle guideComing soonPartners

Contact

Calgary, Alberta+1 587.439.1722concierge@hausinteriordesign.caMonday to Friday, 9 to 5 p.m.
© 2026 HAUS Interiors – Luxury Design & Build Studio Inc.Crafted for the Senses. Designed for Living.

Tools

EstimatorComing soonStyle guideComing soonPartners

Contact

Calgary, Alberta+1 587.439.1722concierge@hausinteriordesign.caMonday to Friday, 9 to 5 p.m.
© 2026 HAUS Interiors – Luxury Design & Build Studio Inc.Crafted for the Senses. Designed for Living.